Project Start Date: January 2009
Project End Date: July 2009
This project involved the inspection of the gorge pipeline from the source to the Bhobhoyi/Umzimkhulu Waterworks. The scope of work was phased as follows:
- Pre-Investigation Phase – the intention was to conduct a high level condition assessment of the pipe. The outcome of the pre-investigation was to establish the general condition of the pipe (whether it is usable or it should be replaced entirely).
- External Corrosion Direct Assessment (ECDA) Investigation – which involved the inspection of the internal lining if the gorge pipeline was still usable.
- Design Phase –the design a suitable protection system, which, most likely, will be a Cathodic Protection System.
- Implementation Phase – the implementation of the selected protection system.
The investigation concluded that the water pipeline was not to be re-conditioned as the costs were prohibitive and the benefits uncertain.
PROJECT OVERVIEW
Ugu District Municipality
RSA
Ugu District Municipality
R1 million / US$ 130 000
- Information gathering
- On site investigations
- Analysis of Results
- Reporting with recommendations to the Client
- Inspection of the Gorge pipeline from the source to the Interconnecting Chamber
- Inspection from the Interconnecting Chamber to the Bhobhoyi/Umzimkhulu Waterworks